About the trust
CIT (erstwhile National Infrastructure Trust) established on September 25, 2023 is registered as an irrevocable trust under the Indian Trust Act, 1882, and as an InvIT under the SEBI Infrastructure Investment Trust Regulations, 2014, since March 7, 2024 (updated registration certificate issued by SEBI on October 16, 2024). GCL is the sponsor, GIMPL is the investment manager and Axis Trustee Services Ltd is the trustee of InvIT.
Subject to the receipt of requisite approvals, the InvIT intends to acquire 100% of the equity shares in the nine project SPVs from the sponsor [Gawar Rohna Jhajjar Highway Pvt Ltd (GRJHPL), Gawar Khajuwala BAP Highway Pvt Ltd (GKBHPL), Gawar Narnaul Highway Pvt Ltd (GNHPL), Gawar Rohna Sonepat Highways Pvt Ltd (GRSHPL), Hardiya Hasanpur Highway Pvt Ltd (HHHPL), Gawar Kiratpur Nerchowk Highway Pvt Ltd (GKNHPL), Dewas Ujjain Highway Pvt Ltd (DUHPL), GBHPL and GNHPL-II].
Additional disclosures in case of provisional ratings for InvIT
The broad details of the group of assets identified by the trust are as follows:
GRJHPL
GRJHPL is an SPV incorporated on April 20, 2018, for redesigning, rehabilitation, upgrading to four lanes, and strengthening, of the Rohna/Hassangarh to Jhajjar section from kilometre (km) 44.80 to km 80.250 of National Highway (NH) 334B in Haryana on HAM. The concession agreement (CA) was signed on May 9, 2018, and the appointed date (AD) was received dated December 18, 2018. The project’s construction and operations periods are 730 days and 15 years, respectively. The project received provisional COD on July 10, 2020, and final COD on July 31, 2020. It has a track record of receiving eight annuities as on October 31, 2024.
GKBHPL
The SPV was formed on April 18, 2018 for upgrading a road to two-lanes with paved shoulder/four-laning of the Khajuwala–Poogal section (design chainage 0+000 km to 30+812 km) and the Poogal-Dantour-Jaggasar-Gokul-Goddu-Ranjeetpura-Charanwala-Naukh-Bap section of NH-911 (design chainage 1+430km to 182+725km; total design length 212.107 km), a part of the BMP in Rajasthan under HAM. The project’s construction and operations periods are 730 days and 15 years, respectively. The CA was signed on September 28, 2018, AD was declared as May 22, 2019, and it achieved PCOD on January 20, 2021, and the final COD as on October 30, 2021. It has a track record of receiving seven annuities as on October 31, 2024.
GNHPL
GNHPL is an SPV incorporated on February 8, 2019. It is established to develop 4/6 laning of Narnaul Bypass crossing to Paniyal Mor (NH 148B) at NH-48 junction = 31.24 km, Nizampur link road= 2.76 km and Narnaul Bypass crossing to Pacheri Kalan=11.30 km (NH-11) in Haryana on HAM under BMP. 11.3 km (four lane) of the stretch is constructed through bitumen and 28 km (6 lane) and 6 km (four lane) through concrete. The CA was signed on February 28, 2019, and the concession period includes construction period of 910 days from AD and fixed operations period of 15 years from the COD. AD was received on September 19, 2019, and the project has received an extension of 88 days owing to the Covid-19 pandemic and 91 days for ban on construction activity due to pollution. The project received COD on January 9, 2021. It has a track record of receiving seven annuities as on October 31, 2024.
GRSHPL
GRSHPL is an SPV, incorporated on April 1, 2019, for redesigning, rehabilitation and upgradation to four lanes and strengthening of Uttar Pradesh/Haryana border to Rohna section from km 0.00 to km 44.80 (design chainage) length (40.50 km) of NH 334B in Haryana on HAM under NH (O) (Package-1). Pavement type is rigid. The CA for the project was executed between the company and NHAI on May 27, 2019, for a concession period including construction period of 730 days from AD and fixed operations period of 15 years from COD. The construction period was extended by 90 days due to the pandemic. AD was declared on January 22, 2020, and the project received PCOD on January 29, 2022, with completion certificate by Independent Engineer (IE) received on April 5, 2022. It has a track record of receiving five annuities as on October 31, 2024.
HHHPL
HHHPL is an SPV, incorporated on September 22, 2020, for the implementation of four-laning of the Rajauli-Bhaktiyarpur section of NH 31 (new NH-20) from km 54+405 to km 101+630 (Package II) on HAM in Bihar. The project is of a rigid (concrete) pavement. The CA for the project was executed between HHHPL and NHAI on October 28, 2020, for a concession period including construction period of 730 days from AD and fixed operations period of 15 years from COD. The company received AD on April 28, 2021, and PCOD on April 27, 2023. It has a track record of receiving three annuities as on October 31, 2024.
GKNHPL
GKNHPL is an SPV incorporated on October 23, 2020, to complete the balance work for four-laning of Kiratpur to Nerchowk section of NH-21 (from km 12+750 to km 26+500 and km 126+500 to km 158+500, including ACC link road from km 0+00 to km 2+003) Greenfield Alignment (excluding Sundernagar Bypass (Package-2) in Himachal Pradesh on HAM basis. The project length is 47.753 km, and the pavement is flexible (bitumen) except for toll plazas, structures and tunnels. The CA for the project was executed between the company and NHAI on November 26, 2020, for a concession period including construction period of 910 days from the AD and fixed operations period of 15 years from COD. The company received the AD on August 12, 2021, PCOD on June 7, 2023, and final COD on September 5, 2023. It has a track record of receiving three annuities as on December 30, 2024.
DUHPL
DUHPL is an SPV incorporated on November 24, 2020, to complete four-laning of Dewas-Ujjain section of NH 148 NG from design ch 0+000 to 19+733 and construction of four-lane Ujjain Bypass from Design ch 19+733 to 26+900 (part-I) and construction of four-lane Dewas Bypass from design ch 0+000 to 14+520 (part-II), with total design length of 41.42 km in Madhya Pradesh. The project pavement is flexible (bitumen). The CA for the project was executed between the company and NHAI on December 11, 2020, for a concession period, including construction period of 730 days from AD and fixed operations period of 15 years from COD. The company received AD on July 6, 2021, PCOD on July 05, 2023 and COD on January 16, 2024. It has a track record of receiving two annuities as on October 31, 2024.
GBHPL
GBHPL is an SPV created by GCL for two/four laning of BRT Tiger Reserve Boundary to Bangalore section of NH -209 (existing chainage from km 287.520 to km 461.550) in Karnataka on HAM under NHDP Phase-IV. GCL had taken over this project through lender’s initiated harmonious substitution from erstwhile concessionaire, Sadbhav Bangalore Highway Pvt Ltd (SBHPL), which was stalled for around a year due to various reasons. CA was signed with SBHPL on December 8, 2016. Substitution of the concessionaire was also approved by NHAI through an Endorsement Agreement dated February 13, 2023. The earlier concessionaire had received PCOD for completed length of 81.75 km (~49% of the total project length) w.e.f. December 31, 2020. The annuities have been paid by NHAI proportionately as per physical progress of the project. As on October 31, 2024, the physical progress of the project stood at 99.3% and it has a track record of receiving seven annuities. PCOD for full length completion has been received as on October 21, 2024.
GNHPL-II
GNHPL-II is an SPV created by GCL for four laning of NH No 87 (New NH No. 9, 109) including the section from km 42.791 (design chainage 43.446) to km 88.000 (design chainage km. 93.226) (Package-II) (approx. 49.78 km in Uttarakhand on HAM. GCL has taken over the project through harmonious substitution from erstwhile Concessionaire viz Sadbhav Nainital Highway Ltd (SNHL), which was substantially delayed due to various reasons including financial distress faced by earlier concessionaire, delay in handing over of the right of way to the site, delay in receipt of approval of estimate for shifting of utilities, delay in approval of design and drawings of rail-over bridge (ROB) from Railway Department and delay due to force majeure event (Covid-19 pandemic). CA was signed with SNHL on June 2, 2016. Substitution of the concessionaire was also approved by NHAI through an Endorsement Agreement dated July 14, 2023. The earlier concessionaire had received PCOD for a completed length of 18.085 km out of 43.90 km w.e.f. October 27, 2019. The annuities have been paid by NHAI proportionately as per physical progress of the project. The project stretch is 97.11% complete as on November 30, 2024, and has received clarity on receipt of the provisional completion certificate (PCC)-II for ~ 90% physical progress completed till July 11, 2024, as outlined in the settlement agreement executed between the company and NHAI on October 15, 2024. The project is completed to the extent of encumbered land provided by NHAI and the company is awaiting receipt of PCC-II. It has a track record of receiving ten annuities as of November 30, 2024.